Marketing will be taking digital photos of the progress every two weeks. Check back here often to see the construction progress

 
02/02/2006 - Shown in this photo are the columns that will support the second floor of the new 5-story tower. The wooden object on the right is a shear wall form. The shear wall is part of the bracing system for the building. In the foreground are the new curb and gutter for entries into the parking lot and driveway.
  02/13/2006 - This photo shows the first area of the second floor being formed.
     
 
02/16/2006 - The following 6 pictures are from the concrete pour of the second floor of the new 5 story building. They started pouring it this morning at 3:00 a.m.
  02/16/2006
 
02/16/2006   02/16/2006
     
 
02/16/2006   02/16/2006
     
 
03/06/2006 - This photo is of the east side of the new structure. On the left side of the photo there are columns that are formed up and ready to be placed. There are also columns with only the reinforcing steel installed, ready for forming. The area near the crane is the third floor being formed. One can also see the temporary support for the second floor, which will remain in place until the two floors above have been placed.
  04/03/2006 - Work continues on the 5-story tower as the 4th floor is being formed
     
 
04/03/2006 - The metal stud framing for the canopy for the entrance to the ED is being constructed.   04/18/06 -This is framing of the 5th floor. If one looks closely, he can see the
plumbing and AC work on level 1.
     
 
05/04/2006 - The new ED entrance continues to stay on schedule.   05/04/06 - Work on the new five-story tower is right on schedule.
     
 
05/30/2006 - Shown is the new ED entrance as it nears completion.   05/30/06 - Five-story Tower construction stays right on schedule
     
 
06/22/2006 - Patients began using Providence's new ED entrance on June 14.   06/22/06 - Construction on the Young Tower continues at a brisk pace.
     
 
07/24/2006 - Here is the latest photo of the tower construction, which continues to stay right on schedule.   08/17/2006 - Tower construction is moving along very well and is right on schedule.
     
 
08/17/2006 - Tower construction is moving along very well and is right on schedule.   09/14/2006 - The flags have been moved farther out from the front of the health center while the new tower continues to take shape.
     
   
11/16/2006 - Tower continues to take shape and is right on schedule.